Posted: December/06/2005 at 8:09pm | IP Logged
|
|
|
Day 37 December 6, 2005 
Dungeon Drop: The big cranes rolled out today. Just the bottom section remains while they break up the concrete.
Serial Thriller: The cranes have dismantled about 40% of the ride.
Ultra Twister: All of the control cabinets have been removed and are being prepared for shipment. The cranes will be dismantling the track soon.
Tidal Wave: The control system has been disconnected.
Serpent: The control system has been disconnected.
Looney Toons: All of the rides are gone.
Why I abuse myself driving around the park to see it coming down, I don't know. It is a hard thing to swallow. I just try to stay focused on the projects that we are assigned.
__________________ It has been a fun ride!
|